Sharaan by Jean Nouvel

Sharaan Nature Reserve, AlUla, Saudi Arabia. The Royal Commission for AlUla commissioned Ateliers Jean Nouvel by competition; the practice records the work as running from 2018 and the project as in construction. The rooms were designed to be cut into sandstone rather than raised on it. The first rock excavation was reported on 26 March 2024. This is the register’s only admitted house that has not opened, and its clearest case of a hotel conceived as subtraction.

The house

Ateliers Jean Nouvel lists the assignment as a competition, the client as the Royal Commission for AlUla, the dates as 2018 to the present and the status as in construction. The programme it records is the resort with an international convention centre and, in the practice’s own French, “deux villas exclusives”, with Hala Warde of HW architecture as partner architect at competition stage and PSM for rock engineering. The designs were published on 27 October 2020 in a release issued with the Royal Commission, describing 40 guest suites, three resort villas, a retreat summit centre of 14 private pavilions nearby, and a resort set to be completed by 2024.

The method is carving. Nouvel’s stated approach is “sculpting within the landscape itself rather than competing with it”, and the precedent cited by client and architect alike is Hegra, Saudi Arabia’s first UNESCO World Heritage Site: 52 hectares holding more than 100 Nabataean tombs with facades cut into sandstone. Amr AlMadani, then chief executive of the Royal Commission, said of AlUla, “We are a destination built by artists.” The Commission documents the reserve holding the site at 1,540 square kilometres, in AlUla’s Eastern Canyons. On 26 March 2024 the press reported the initial rock excavation. The count given then was 38 suites, and Bouygues Construction was named for the engineering.

What distinguishes it

The commission was won in competition and has run since 2018 Ateliers Jean Nouvel records the type of assignment as a competition and the project dates as 2018 to the present, with the status given as in construction. More than thirty architects, interior architects and landscape, 3D and graphics staff are listed across the competition and concept phases. Six years separate the start of that work from the first excavation of rock.

The hotel was drawn as subtraction, not construction The rooms were designed to be cut into the sandstone rather than built on it, with the excavated volumes stacked one above another and reached from a central lift shaft reported at 80 metres. The entrance was drawn as a circular courtyard carved into the hillside. Nothing in the published scheme stands above the rock line.

The precedent named is a necropolis, not a hotel Client and architect both cite Hegra, the principal southern city of the Nabataean kingdom and Saudi Arabia’s first UNESCO World Heritage Site: 52 hectares, more than 100 tombs with facades cut into sandstone, about 2,000 years old. The practical argument drawn from it is thermal — Nabataean rock-cut habitats kept “away from the heat of the summer and the cold of the winter”. The register notes that the model is funerary architecture adapted to lodging.

The published room count fell between 2020 and 2024 The Royal Commission’s release of 27 October 2020 gives 40 guest suites and three resort villas, with 14 private pavilions at a retreat summit centre nearby. The reporting of the first excavation in March 2024 gives 38 suites. Neither figure has been withdrawn by its publisher, and the register records both rather than a figure between them.

A completion year was named once and has not been named again The 2020 release said the resort was set to be completed by 2024. When the first rock excavation was reported in March 2024, no completion year was given in its place. The project has therefore passed the only opening date its client ever published.

WHAT IS NOT YET TRUE

There is no house here to stay in. No opening date, no rates and no accommodation of any kind have been published, and no guest has slept on the site. What exists is a competition-winning design of 2018, a client, a contractor, a reserve of 1,540 square kilometres and an excavation begun in 2024. Everything written above is a record of intention and of work, not of a hotel in operation.

Signature rooms and dates

2018Ateliers Jean Nouvel begins work for the Royal Commission for AlUla
The practice records the assignment as a competition and the project dates as 2018 to the present.
2020The designs are published on 27 October
40 guest suites, three resort villas and a retreat summit centre of 14 private pavilions near the resort.
2020A completion year is named
The release says the resort is set to be completed by 2024; it is the only completion year the client has published.
2020The carving is described
Rooms arranged around a central lift shaft reported at 80 metres, entered through a circular courtyard cut into the hillside.
2020Hegra is named as the precedent
52 hectares and more than 100 Nabataean tombs cut into sandstone, Saudi Arabia’s first UNESCO World Heritage Site.
2024The first rock excavation is reported on 26 March
Described as the initial rock excavation in the Sharaan Nature Reserve, with the excavated areas stacked one above the other.
2024The suite count is given as 38
Reported as 38 bespoke suites carved into the sandstone mountains, two fewer than the 2020 figure.
2024Bouygues Construction is named
The contractor is paired with Nouvel’s design for the engineering of the excavation.
2026The reserve is documented at 1,540 square kilometres
The Royal Commission’s fact sheet places it in AlUla’s Eastern Canyons and records its conservation partners.

Competitive landscape

People anchored here

Sources

What the entry rests on, read 13 October 2026. Each reference records the facts it supports, so a disputed line can be traced to the account it came from.

Ateliers Jean NouvelSharaan Desert Resort — project page, read 13 October 2026the commission dates from 2018, was won in competition, and the project is in construction; the programme includes an international convention centre and two villas
Royal Commission for AlUla / Ateliers Jean NouvelPress release, Sharaan by Jean Nouvel, 27 October 2020, read 13 October 202640 guest suites, three resort villas and a summit centre of 14 private pavilions were announced on 27 October 2020; the architect’s stated method is to sculpt within the landscape; Amr AlMadani, chief executive of the Royal Commission for AlUla, framed the project
DezeenJean Nouvel reveals cave hotel in Saudi Arabia’s AlUla desert, 27 October 2020, read 13 October 2026the central lift shaft was published at 80 metres and the entrance as a circular carved courtyard
ArchDailyJean Nouvel Designs Resort in Saudi Arabia, Hidden Within Rock Dwellings, read 13 October 2026completion was targeted for 2024 and the scheme listed 40 guest suites; the Nabataean precedent is cited for thermal performance
Breaking Travel NewsAlUla’s Sharaan Resort breaks ground, 26 March 2024, read 13 October 2026the first rock excavation was reported on 26 March 2024 and the suite count given as 38; the suites are to be carved into the sandstone mountains
Royal Commission for AlUlaSharaan Nature Reserve fact sheet, read 13 October 2026the Sharaan reserve covers 1,540 square kilometres in AlUla’s Eastern Canyons